
Product Overview
Water distribution saddle, also known as threaded saddle, pipe water distribution clip, or Haf saddle, belongs to the category of pipe branch connectors. It is mainly used for non-stop water opening and branching on PE pipes, PVC pipes, ductile iron water supply pipes, and steel pipes. It does not require cutting off the main pipe and can directly open holes on the side of the pipe to branch out. It is widely used in water supply and drainage pipe network renovation projects.
Product Description
Detailed Description
Ductile iron body: cast as a whole with high strength, water pressure resistance, not easy to crack, stable pressure bearing performance, meeting the pressure requirements of municipal water supply. Internal and external blue epoxy spraying: epoxy resin anti-corrosion coating, resistant to rust and water corrosion, waterproof pipe medium erosion, suitable for long-term use of buried and outdoor water supply pipelines. Clamp locking structure: Double bolt fastening, arc-shaped fitting on the outer wall of the pipeline, uniform force, matched with rubber sealing gasket, tightly sealed after clamping, not easy to leak water. Thread branch design: Reserved internal thread holes in the middle, which can be directly connected to the branch pipe after opening. Installation is simple, without welding or pipe breakage, and can be operated without stopping water and pressure. Municipal water supply pipeline, community water supply network renovation, fire water supply, farmland irrigation pipeline, PE/PVC/ductile iron main and branch pipe diversion, repair and connection of branch pipes.
Compatibility
Drop-in replacement
This Junyue grooved piping component is engineered for seamless compatibility with Victaulic Style 07 and Grinnell system layouts. Verify pipe OD, groove profile, gasket compound, pressure class, and project approvals before specifying as a replacement.
Technical FAQ
Application limits
Complete specifications: Suitable for various main pipe outer diameters, diverse branch diameters, supporting various PE, PVC, cast iron water supply pipelines such as DN50~DN300.
Order & Delivery
Shipping and lead time
- Factory: Weifang, Shandong, China
- Port: Qingdao Port, approx. 2 hours
- Lead Time: FCL 15-20 days
- Certificate: EN 10204 3.1 mill test certificate available
Certifications
Quality & compliance
Junyue products are manufactured under ISO 9001, ISO 14001, and ISO 45001 management systems, with UL listings and CE marking for international markets.










Send an Inquiry
Request price and availability
Your inquiry will be sent directly to our export team.
Inquiry Submitted
Thank you. We will respond within 24 hours.